Industrial Project Execution & Plant Installation Experts in Delhi
NIIR Project Consultancy Services (NPCS)
⌖ Delhi
₹28,000 – ₹52,000 / month
Industrial Project Execution & Plant Installation Experts in Delhi at NIIR Project Consultancy Services (NPCS). Advertised pay is ₹28,000–₹52,000 per month. ##### Responsibilities: • Supervise plant installation and equipment erection at project sites • Coordinate with equipment suppliers and contractors during project execution • Ensure proper alignment, calibration, and me
Last seen by Wimaan: 23 Nov 2026
Job at a Glance
- Salary
- ₹28,000 – ₹52,000 / month
- Location
- Delhi
- Experience
- Available on Wimaan app
- Shift
- Available on Wimaan app
- Work mode
- Available on Wimaan app
- Job type
- Available on Wimaan app
- Qualification
- Diploma or Degree in Engineering (Mechanical preferred)
- Openings
- Available on Wimaan app
Do you qualify?
Requirements are exactly as stated in the employer listing.
- ✓ Key Skills:
- ✓ Strong knowledge of industrial plant installation and project execution
- ✓ Knowledge of industrial utilities and plant infrastructure systems, Strong problem-solving and technical documentation skills
About This Role
##### Responsibilities: • Supervise plant installation and equipment erection at project sites • Coordinate with equipment suppliers and contractors during project execution • Ensure proper alignment, calibration, and mechanical integration of machinery • Oversee piping, structural fabrication, and mechanical installations • Manage plant commissioning, testing, and trial production runs • Ensure compliance with industrial safety and engineering standards • Provide technical guidance during plant setup and startup operations ##### Key Skills: • Strong knowledge of industrial plant installation and project execution • Experience in mechanical erection, piping, fabrication, and equipment alignment • Expertise in plant commissioning and troubleshooting, Ability to coordinate with vendors, engineers, and project teams • Knowledge of industrial utilities and plant infrastructure systems, Strong problem-solving and technical documentation skills • Mechanical Engineering / Industrial Engineering / Plant Engineering • Diploma or Degree in Engineering (Mechanical preferred) ###### Contact Details Person: Mr. Kumar Email: response.npcs@gmail.com Phone: 9811043595
✦ Summarised by Wimaan AI from the employer listing · facts unchanged
Responsibilities
- ✓ Supervise plant installation and equipment erection at project sites
- ✓ Coordinate with equipment suppliers and contractors during project execution
- ✓ Ensure proper alignment, calibration, and mechanical integration of machinery
- ✓ Oversee piping, structural fabrication, and mechanical installations
- ✓ Manage plant commissioning, testing, and trial production runs
Eligibility
- ✓ Key Skills:
- ✓ Strong knowledge of industrial plant installation and project execution
- ✓ Knowledge of industrial utilities and plant infrastructure systems, Strong problem-solving and technical documentation skills
Pay & Benefits
₹28,000 – ₹52,000 / month
Pay shown only as stated in the source listing.
No benefits were specified in the source listing.
Documents to Keep Ready
The employer did not provide a document checklist. Only share documents requested through the original listing.
Frequently Asked Questions
What is the salary for this industrial project execution & plant installation experts job?+
NIIR Project Consultancy Services (NPCS) lists ₹28,000–₹52,000 per month for this role.
Where is this industrial project execution & plant installation experts job located?+
This role is listed in Delhi.
Is there a fee to apply?+
Applying through Wimaan is free. Do not send money to anyone promising this job.
How to apply
- Review the employer-provided details and confirm the role suits your location and availability.
- Select the Wimaan application button to continue through the app.
- Complete your application securely in the Wimaan app. Wimaan does not charge candidates to apply.
Tell Wimo where you want to be. It finds the jobs that get you there.
Try asking Wimo: “Find driver jobs near me” or “Which job pays more than mine?”
Download Wimaan — Free